RP Insights.
AER Releases Draft Export Tariff Guidelines
The AER has released draft Export Tariff Guidelines for consultation, which provide guidance about how distributors should define the basic export level for distributed energy resources (such as solar PV), and how they should develop and justify proposals for export pricing.
ESB initiates Capacity Mechanism design
The Energy Security Board’s (ESB) final advice on the Post 2025 Market Design Review proposed a reform pathway for resource adequacy, including recommendation of a mechanism to explicitly value capacity in the rapidly changing National Electricity Market (NEM) over coming years.
REZ Access Rights and Scheme Design: Central-West Orana
Released in December 2021, the consultation paper sets out, and seeks feedback on, key design aspects of the NSW Government’s work to coordinate and encourage investment in the Central-West Orana Renewable Energy Zone (REZ) under its Electricity Infrastructure Roadmap.
Connections Reform Roadmap
The Connections Reform Roadmap was published in December 2021, as part of the Connections Reform Initiative jointly sponsored by AEMO and the CEC. The Roadmap outlines priority reforms, identified in collaboration with industry, needed to overcome the challenges in connecting generators to the grid.
AER releases Rate of Return Information Paper and calls for submissions
The Australian Energy Regulator released its 2022 Rate of Return Instrument Information Paper on 17 December 2021, which is the next step toward the final 2022 Instrument (due for publication in December 2022). It sets out six priority issues for further analysis and stakeholder feedback.
AEMO’s Draft 2022 Integrated System Plan
AEMO recently released the Draft 2022 Integrated System Plan (ISP), a whole of system plan which provides AEMO’s least cost development pathway for the National Electricity Market. AEMO has identified its ‘Step Change’ scenario as the most likely scenario.
AEMC Relies on Existing Roles to Govern DER Technical Standards
The AEMC published a draft rule determination on 16 December 2021 on the governance of DER technical standards. The draft determination is to not make a rule; the AEMC preferring to use existing powers and roles under energy laws to realise DER technical standards and integration.
AER Developing New Guidance for DER Integration
The AER is developing new guidance for DNSPs following the AEMC’s final determination on access, pricing and incentive arrangements for DER. The guidelines are intended to guide efficient levels of DER export investment and appropriate two-way price signals
Operating Reserves and Ramping Services – Design Choices and Implications
The AEMC recently extended its time to make draft determinations on operating reserves and ramping services until June 2023. These will now be published after the ESB’s final advice to Energy Ministers on a resource adequacy mechanism
AEMC Publishes Final Rule Determination on Integrating Energy Storage Systems into the NEM
On 2 December 2021, the AEMC published its Final Rule Determination on Integrating Energy Storage Systems into the NEM, creating a new Integrated Resource Provider participant category
AEMC Transmission Planning and Investment Review
On 19 August 2021, the AEMC published a Consultation Paper for the Transmission Planning and Investment Review.
AEMC Reviews the Regulatory Frameworks for Hydrogen and Renewable Gases
The Australian Energy Market Commission (AEMC) published a Consultation Paper on the Review into Extending the Regulatory Frameworks to Hydrogen and Renewable Gases
AER seeks feedback on its Regulatory Sandbox Toolkit
The AER is consulting on its proposed regulatory sandbox toolkit following the Australian Energy Market Commission’s (AEMC) regulatory sandbox recommendations to the COAG Energy Council on 26 September 2019, and further advice on rule changes on 26 March 2020.
AER Releases New Ring-Fencing Guidelines
What is the Ring-Fencing Guideline change and how does it affect you?